Realisations

Panattoni Wałbrzych

Panattoni Wałbrzych

Leave review
Another important project commissioned by Atlas Ward Polska Sp. z o.o. As Kera Awak, we have already been involved in three stages of the construction of a logistics and warehousing facility with an office building in Wałbrzych. The owner of the buildings is Panattoni Development Europe Sp. z o.o. Work for Atlas Ward each time gives us an opportunity to show the full range of possibilities. For each of the stages, we have prepared a smoke ventilation design, as well as a CFD simulation assessing the correct functioning of the smoke ventilation installation. The solutions proposed in the project were delivered and installed by our team. Smoke vents with pneumatic actuators were applied together with necessary installation. The smoke vents have been installed with fall protection grids. Skylights with NRO KERA Fire Protect technology, which provides the Broof(t1) classification, are responsible for the supply of natural lighting to the rooms inside the building.
Contractor
Atlas Ward Polska Sp. z o.o.
Date
26 January 2022
Location
Wałbrzych, Lower Silesian Voivodeship, Poland
Read More
Koimex Świebodzin

Koimex Świebodzin

Leave review
As part of cooperation with Przedsiębiorstwo Budowlane CEGBUD Sp. z o.o. from nearby Wolsztyn, we marked our presence on three construction stages for Koimex S.A. In Świebodzin we had the opportunity to install almost every one of our products. Starting from continuous skylights, both fixed and with ventilation vents, through skylights and roof hatches, to smoke vents with the necessary installation. We used KERA Fire Protect NRO technology in each of our products, providing a Broof(t1) classification.
Contractor
Przedsiębiorstwo Budowlane CEGBUD Sp. z o.o.
Date
31 October 2021
Location
Świebodzin, Lubusz Voivodeship, Poland
Read More
Dino Sierpc

Dino Sierpc

Leave review
The task commissioned by Atlas Ward Polska Sp. z o.o. was approached comprehensively. In the first stage, our work consisted in preparation the design of the smoke ventilation system for the Dino Logistics Center in Sierpc. We also delivered and installed solutions proposed in Kera Awak's design. In order to ensure effective smoke removal from the building, we applied point smoke vents with pneumatic drive with the necessary installation. The smoke vents were additionally equipped with anti-falling grids. To provide light for the rooms inside the building we used skylights with NRO KERA Fire Protect technology, which provides a Broof(t1) classification. Roof access is provided by Kera Awak's roof hatches.
Contractor
Atlas Ward Polska Sp. z o.o.
Date
30 September 2021
Location
Sierpc, Masovian Voivodeship, Poland
Read More
Military Base Elbląg

Military Base Elbląg

Leave review
At the Military Base in Elblag, we were commissioned (by AMW Sinevia Sp. z o.o.) to deliver and install Kera Awak's products. Fixed continuous skylights allowed for lighting the building interior. Continuous skylights equipped with ventilation vents, apart from their natural lighting function, ensured the possibility of ventilation at any time of the rooms located below. The whole project was finalized by the installation of smoke vents, providing a sense of security to the building users in case of smoke.
Contractor
AMW Sinevia Sp. z o.o.
Date
31 August 2021
Location
Elbląg, Warmian-Masurian Voivodeship, Poland
Read More
MZK Szczecin

MZK Szczecin

Leave review
PW OL-AN Aneta Olejniczak from Skwierzyna commissioned us to replace the glass skylights on the roof of the existing Tramwaje Szczecińskie building. The old skylights were replaced with Kera Awak's continuous skylights with polycarbonate cover in NRO KERA Fire Protect technology (providing a Broof(t1) classification). In addition to providing uniform lighting to the interior of the building, we have also provided ventilation by installing ventilation vents in the skylights with the necessary electrical installation.
Contractor
PW OL-AN Aneta Olejniczak
Date
31 August 2021
Location
Szczecin, West Pomeranian Voivodeship, Poland
Read More
Impact Mosina

Impact Mosina

Leave review
For the Real Leszno we provided lighting and a smoke ventilation system in the Impakt warehouse in Mosina.
Contractor
Real Leszno
Date
4 July 2019
Location
Mosina, Greater Poland, Poland
Read More
Poznań University of Physical Education

Poznań University of Physical Education

Leave review
In the Poznań University of Physical Education we replaced old skylights and smoke vents with new ones.
Contractor
Poznań University of Physical Education
Date
21 May 2019
Location
Poznań, Greater Poland, Poland
Read More
Jost Kościan

Jost Kościan

Leave review
For the Jakon in production and warehouse hall in Kościan we installed continuous rooflights equipped with ventilation vents.
Contractor
Jakon
Date
15 July 2019
Location
Kościan, Greater Poland, Poland
Read More
VW Antoninek

VW Antoninek

Leave review
In the Volkswagen factory in Antoninek Poznań we disassembled the existing glass skylights, then we installed our continuous rooflights.
Contractor
Volkswagen
Date
5 May 2019
Location
Poznań Antoninek, Greater Poland, Poland
Read More
Multichem Tarnowo Podgórne

Multichem Tarnowo Podgórne

Leave review
In the Multichem plant in Tarnowo Podgórne we installed skylights and smoke ventilation system.
Contractor
Multichem
Date
9 June 2019
Location
Tarnowo Podgórne, Greater Poland, Poland
Read More